The Electrification of Double Track Project that runs through Perak, Penang, Kedah and Perlis involved the laying and electrification of a 329km double track to replace the existing single track that runs from Ipoh in Perak to Padang Besar in Perlis. The project was a part of a master plan to improve the public transport system in Malaysia. In 2021, the KTM ETS service ferried around 615,000 passengers.

Success Stories
MMC-Gamuda Joint Venture Sdn Bhd
Project
KTM ETS Ipoh-Padang Besar
Financing
RM6.7 billion (2009)
Other Success Stories

Kuala Lumpur Sentral Sdn Bhd
Project: KL Sentral Station | Funding: RM800 million (1999)

Express Rail Link Sdn Bhd
Project: ERL Train | Funding: RM704 million (1999) & RM1.5 billion (2003)

Syarikat Mengurus Air Banjir & Terowong Sdn Bhd
Project: SMART Tunnel | Funding: RM323 million (2004)

Jambatan Kedua Sdn Bhd (Penang Second Bridge)
Project: Penang Second Bridge | Funding: RM500 million (2009)